ScopeGrade
Field setFree tool · No 04

Material Takeoff

Upload a plan for AI-assisted material detection, or build a takeoff by hand — group by trade, room, floor, or phase, and move the finished list straight into an estimate.

01 — Choose a trade11 trades · multi-trade
Decking — dimensions
ft
ft
10%Waste factor
Field noteYou'll need about 419 lin ft of decking — order 461 to cover the 10% waste factor for cuts and end-trim.
02 — Takeoff results0 items
Group by
ScopeGrade · Material Takeoff
No materials in this takeoff yet

Add a trade from the manual calculator, or upload a plan for AI-assisted detection, to start building your takeoff.

Estimated material cost$0
Material cost
$0