Estimate vs quote: what's the difference?

Contractors use the words differently, so the label matters less than one question: is this number firm, and what would change it?

ScopeGrade EditorialWritten with working contractors1 min read

In everyday use, an estimate is an informed approximation of what a job will cost, and a quote is a firm price for a defined scope. In practice, contractors use the two words loosely — plenty of “estimates” are fixed-price offers, and plenty of “quotes” include allowances that can change. So don't rely on the heading on the page.

The questions that actually matter

  1. Is this price fixed for the scope described? If yes, the contractor carries the risk of their own estimating.
  2. What could change it? Look for allowances, unit rates and “subject to site conditions”.
  3. How long is it valid? Material prices move; most offers hold for 30 days or so.
  4. How are changes handled? In writing, priced before the work is done.
Typically an estimateTypically a quote
PurposeA realistic range to plan and decideA price to agree and sign
Based onYour description, measurements and photosA confirmed scope, usually after a site visit
Can change?Yes — expected to be refinedOnly through agreed changes or stated allowances
DetailOften summarisedItemised scope, materials, terms